跳到页面主要部分
选购旅游产品
选购旅游产品
选购旅游产品
住宿
住宿
机票
机票
租车
租车
套餐
套餐
旅游活动
旅游活动
优惠
团体及会议
最后时限优惠
打开 App
HKD
发布您的住宿
联系我们
行程
Communication Center
登录
通过会员价解锁折扣立减
通过 One Key™ 计划在 我们各品牌平台获得奖励
登录
我要提建议
北美
乔治城电厂博物馆
西雅图
华盛顿
美国
北美
计划您的旅行
乔治城电厂博物馆周边酒店
乔治城电厂博物馆租车
南西雅图度假
乔治城电厂博物馆
The boiler room at the Steam Plant offers an eerie glimpse into early 20th-century working conditions. Oil (and later coal) was fed into 16 giant boilers to produce the steam required to turn the Curtis Steam Turbines in the room next door. The Georgetown Steam Plant was built in 1906 to provide power for Seattle's streetcars, the city of Georgetown, and the Seattle-Tacoma Railway. Although the turbines were state-of-the art for their time, the technology was advancing so quickly that the plant became outdated within 10 years. It was soon relegated to secondary status and was used occasionally through the 1970s during droughts and to meet peak power demand. Today, the nearly-complete plant is operated as a free museum and is open to the public the second Saturday of every month from 10am-2pm.
The boiler room at the Steam Plant offers an eerie glimpse into early 20th-century working conditions. Oil (and later coal) was fed into 16 giant boilers to produce the steam required to turn the Curtis Steam Turbines in the room next door. The Georgetown Steam Plant was built in 1906 to provide power for Seattle's streetcars, the city of Georgetown, and the Seattle-Tacoma Railway. Although the turbines were state-of-the art for their time, the technology was advancing so quickly that the plant became outdated within 10 years. It was soon relegated to secondary status and was used occasionally through the 1970s during droughts and to meet peak power demand. Today, the nearly-complete plant is operated as a free museum and is open to the public the second Saturday of every month from 10am-2pm.
These control panels monitored the Curtis Steam Turbines installed in 1906 and 1907. Although the turbines were state-of-the art for their time, the technology was advancing so quickly that the plant became outdated within a decade. It was soon relegated to secondary status and was used occasionally through the 1970s during droughts and to meet peak power demand. Today, the nearly-complete plant is operated as a free museum and is open to the public the second Saturday of every month from 10am-2pm.
This 1907 Curtis Steam Turbine is one of only a handful still remaining from the early days of electrical power generation. Turbine design was at the forefront of technology in the early 1900s, and this particular turbine is a wonderful example, as it generated nearly 3 times the power of an adjacent turbine installed just one year earlier. Later, in 1917, a much smaller third turbine was added, which itself generated nearly as much power as the first two turbines combined. Such is the relentless pace of technology, and why so few of these historical turbines remain. The Georgetown Steam Plant was built in 1906 to provide power for Seattle's streetcars, the city of Georgetown, and the Seattle-Tacoma Railway. Although the turbines were state-of-the art for their time, the technology was advancing so quickly that the plant became outdated within 10 years. It was soon relegated to secondary status and was used occasionally through the 1970s during droughts and to meet peak power demand. Today, the nearly-complete plant is operated as a free museum and is open to the public the second Saturday of every month from 10am-2pm.
Seattle Electric Company branding can still be found on some of the large boilers at this 1906 power plant. The boilers produced enough steam to turn three Curtis Steam Turbines located in the adjacent room, generating up to 21K kilowatts. The Georgetown Steam Plant was built in 1906 to provide power for Seattle's streetcars, the city of Georgetown, and the Seattle-Tacoma Railway. Although the turbines were state-of-the art for their time, the technology was advancing so quickly that the plant became outdated within 10 years. It was soon relegated to secondary status and was used occasionally through the 1970s during droughts and to meet peak power demand. Today, the nearly-complete plant is operated as a free museum and is open to the public the second Saturday of every month from 10am-2pm.
6
查看全部 6 张照片
套餐
住宿
机票
租车
旅游活动
已添加住宿
已添加机票
经济舱
已选择
经济舱
经济舱
高端经济舱
高端经济舱
商务舱
商务舱
头等舱
头等舱
出发地
切换出发地和目的地
目的地
日期
旅客
客房 1
成人
减少客房 1 内的成人人数
增加客房 1 内的成人人数
儿童
2 至 17 岁
减少客房 1 内的儿童人数
增加客房 1 内的儿童人数
婴儿
2 岁以下
减少客房 1 内的婴儿人数
增加客房 1 内的婴儿人数
添加另一间客房
确定
搜索
我的行程只有部分日期需要住宿
浏览地图
游览乔治城电厂博物馆
Activities
计划您的乔治城电厂博物馆之旅
过去 48 小时内搜索到的价格。点击以查看更新价格。
旅行天数
3 晚
4 晚
5 晚
6 - 7 晚
住宿等级
5 星级
4 星级及以上
3 星级及以上
2 星级及以上
机票舱位
经济舱
高端经济舱
商务舱
头等舱
删除所有筛选条件
贝尔敦酒店
2.5 out of 5
Downtown Seattle
原价为每人 HK$5,586,现价为每人 HK$4,027
HK$5,586
HK$4,027
每人
4月30日 - 5月3日
1 天前报价
包含往返机票
橘郡 (SNA) 至 西雅图 (SEA)
9.2/10
Wonderful! (4,418 条点评)
Overall very good and convenient to every key downtown places in 10 to 30 mins by walking.👍
点评日期:2024 年 10 月 5 日
地中海客栈
3 out of 5
Downtown Seattle
机票立省 100%
原价为每人 HK$6,004,现价为每人 HK$4,281
HK$6,004
HK$4,281
每人
4月30日 - 5月3日
1 天前报价
包含往返机票
橘郡 (SNA) 至 西雅图 (SEA)
9.4/10
Exceptional! (5,766 条点评)
Close to Seattle Center and relatively cheap for overnight parking.
点评日期:2023 年 8 月 17 日
厄齐沃特酒店
4 out of 5
Downtown Seattle
机票立省 100%
原价为每 人 HK$6,785,现价为每人 HK$4,879
HK$6,785
HK$4,879
每人
4月30日 - 5月3日
1 天前报价
包含往返机票
橘郡 (SNA) 至 西雅图 (SEA)
9/10
Wonderful! (1,171 条点评)
观光一日游