I booked a stay at this location on 03/07/23, for a 7-night stay from 10/02/23 to 10/09/23. On 09/21/23 I received the access code from VACASA and was notified that we would not be able to use the rooftop terrace due to HOA maintenance work but the work would be completed by 10/06/23. I asked repeatedly what maintenance work was being done but received no response from VACASA. Arrived on Monday 10/04 as scheduled and then on 10/03 at 09:00am demolition work began and continued until after 4:00pm. (by 'demolition work' think hammering, pounding, grinding, sawing, dropping, shouting, loud music, etc. the entire house on every floor shaking from the work being done on the roof.) On 10/04 at 06:30am demolition work resumed and continued until after 4:00pm. At 4:50pm VACASA called and were told that the maintenance workers would need to turn off the air conditioning for an hour. On 10/05 at 07:00am we were notified by the maintenance team supervisor that they were turning off the air conditioning immediately until after lunch and then demolition work resumed and continued until after 4:00pm. On Friday, 10/06 at 07:00am, demolition work resumed and continued until after 3:00pm. Thinking the work was finally complete went up to the rooftop terrace expecting to enjoy the views as advertised only to open the door and see that the work was far from complete, and the rooftop terrace was unusable. Demolition work resumed on Monday 10/09 at 07:00am. So much for a peaceful vacation.